3000 m3/h- H2S 300ppm- Richmond Street WWPS Odour Treatment Plant

Odour Treatment Plant

OdaTech completed installation of an odour control system in Cannington, WA.  While currently a retail & industrial area, it is earmarked for future housing development and it was determined by the Water Corporation that the current odour issues would not be acceptable once these developments were completed.

The system, which is similar to the one installed in 2015 for Flora Street WWPS, consists of six biofilters operating in a paralell 3×2 arrangement to ensure 99%+ removal, with a backup activated carbon polishing filter, to be used during infrequent system maintenance to ensure that there is no interruption in treatment.

Request a Quote